TIMELY NEEDS CATALOG LIBRARY & RESEARCH CENTER | NATIONAL WATCH & CLOCK MUSEUM | EDUCATION | IT, PUBLISHING, FACILITIES & MAINTENANCE
General Needs including IT (computer, Internet, web), Publishing, Facilities, and Maintenance .
![]() Where Most Needed
![]() NAWCC
National Watch
& Clock Museum
Columbia, PA
|
![]() REPLACE MUSEUM AIR HANDLER
Help us become energy efficient, improve air quality, and reduce operating costs by replacing our 1990s era air conditioning unit with modern efficient unit. PROJECT COST: $231,000
![]() REPLACE LIBRARY AIR HANDLER
Help us become energy efficient, improve air quality, and reduce operating costs by replacing our 1990s era air conditioning unit with modern efficient unit. PROJECT COST: $140,000
![]() REPLACE OFFICES AIR HANDLER
Help us become energy efficient, improve air quality, and reduce operating costs by replacing our 1990s era air conditioning unit with modern efficient unit. PROJECT COST: $118,000
![]() MUSEUM ROOFING SECTIONS
By applying roof coating, we are able to extend the life of the facility roof. PROJECT COST: $36,000
LIBRARY ROOFING SECTIONS
By applying roof coating, we are able to extend the life of the facility roof. PROJECT COST: $84,000
![]() EMERGENCY GENERATOR
Provide power to maintain security systems, computer servers, phone systems, and other critical elements during power outages. PROJECT COST: $30,000
![]() EXTERIOR PAINTING
Gutters and trim: $10K; Roof: $20K Help us protect and maintain our 40 thousand square foot building. PROJECT COST: $30,000
![]() DIGITIZE MEMBERSHIP RECORDS
Funds to digitize membership records dating back to 1943 to reduce storage and improve access.
![]() PARKING LOT
Repairs as needed. PROJECT COST: $45,000
![]() EXHIBIT AREA FLOOR REPAIR
Fix concrete and replace floor covering. PROJECT COST: $10,000
![]() SCHOOL FACILITY WALLS & FLOOR REPAIR
Repair damage caused by an earthquake. PROJECT COST: $6,000
![]() COMPUTER ROOM
Replace deteriorated floor tile. ![]() SCHOOL FACILITY SIDEWALK REPAIR
Improve sidewalks to reduce potential liability. PROJECT COST: $2000
![]() |
||
|
|||
|